Avadium Design logo
Home / Blog / Manufacturing
Manufacturing

Design for Manufacturing (DFM): How to Cut Unit Cost Before You Cut Steel

Most of your product's cost is decided long before production starts. DFM is how you take control of it — here's the framework, the rules and the checklist.

If you want to lower the cost of a product, the factory floor is the worst place to start. By the time a product reaches production, the materials, part count, tolerances and assembly method are already fixed — and so is most of the cost. Design for Manufacturing (DFM) moves those decisions to where they're cheap to change: the design phase.

Why most cost is locked in at design

70–80%Of manufacturing cost determined by design decisionsDesign for Manufacture research
~8%Of the product budget spent by the time design is finishedDavid M. Anderson via Altium
~80%Of cost already committed at that same pointDavid M. Anderson via Altium
60%Average share of an electronic product's cost that is materialsSiemens

Cost committed vs. money spent across development

0%20%40%60%80%100%StartConceptValidatedDesign doneToolingProductionCost committedMoney spent
Conceptual curve based on the widely cited Westinghouse curve and David M. Anderson's 8% spent / 80% committed rule of thumb.

Engineering literature commonly reports that 70–80% of a product's manufacturing cost is determined by design decisions, while production decisions account for only about 20%. DFM expert David M. Anderson frames it in budget terms: when the design is finished, only around 8% of the budget has been spent — but about 80% of the cost has been committed.

DFM is the highest-ROI hour in product development. One review before tooling routinely uncovers savings that pay for the entire design engagement.

Mario EsquerFounder & Principal Designer, Avadium Design

Core DFM rules for injection-molded parts

RuleGuidelineWhy it saves money
Uniform wall thicknessKeep walls consistent (typ. 1.5–3 mm for many plastics)Prevents sink, warp and long cycle times
Draft angles1–2° minimum; more for textured facesParts eject cleanly; less tool wear
Avoid undercutsRedesign or use bumpoffs instead of side actionsSide actions add tooling cost
Ribs, not thicknessRib thickness ~50–60% of wallStrength without material or sink
Radii on cornersInside radius ≥ 0.5× wallReduces stress and improves flow
Reduce part countCombine parts; use snap fits and living hingesFewer tools, less assembly labor
Standardize fastenersOne screw size where possibleSimpler BOM and assembly
Engineers working on a manufacturing line
DFM reviews bring designers and manufacturing engineers to the same table. Photo: Unsplash

DFM + DFA: design for assembly

Design for Assembly (DFA) is DFM's partner. Every part that must be picked, oriented and fastened costs labor and creates a chance for error. Our DFA questions for every component:

  • Does this part move relative to others? If not, can it be combined?
  • Must it be a different material? If not, can it be merged?
  • Must it be separate for service or assembly? If not, eliminate it.
  • Can it be inserted from one direction, top-down, without tools?
  • Is it self-locating and impossible to install backward?

Illustrative impact of part-count reduction on a consumer product

14 partsOriginal9 partsAfter DFA6 partsAfter DFM+DFA
Illustrative example of a typical DFA consolidation; actual results depend on the product.

The Avadium DFM review checklist

What we check before tooling

01Process fitRight process for volume
02GeometryWalls, draft, undercuts
03TolerancesOnly where needed
04MaterialsCost, availability, compliance
05AssemblyPart count & fasteners
06Cost modelUnit + tooling vs. target

Match the process to the volume

3D printing and urethane casting suit tens to hundreds of units; aluminum tooling suits thousands; hardened steel suits hundreds of thousands. Picking the wrong process is the most expensive DFM error.

Tolerance only what matters

Tight tolerances everywhere drive up machining, inspection and scrap. Specify tight tolerances on critical fits and let everything else follow standard process capability.

Build a cost model early

We estimate unit cost, tooling cost and landed cost during concept — not after. If the numbers don't support your retail price, the design changes before CAD is final.

Our rule is simple: no steel gets cut until the DFM report is green. It's cheaper to change a line in CAD than a cavity in a mold.

Mario EsquerFounder & Principal Designer, Avadium Design

Frequently Asked Questions

What is design for manufacturing (DFM)?

DFM is the practice of designing parts and products so they can be manufactured efficiently, reliably and at the lowest cost for the target volume and process.

When should a DFM review happen?

Continuously, starting at concept — with a formal DFM review before prototyping for function and again before releasing files for tooling.

How much can DFM save?

Savings vary, but because design decisions determine most manufacturing cost, DFM reviews frequently reduce part count, tooling complexity and unit cost meaningfully.

Does Avadium offer stand-alone DFM audits?

Yes. Avadium offers DFM audits of existing CAD, with a prioritized report of cost, quality and manufacturability issues. Book a call.

Get a DFM audit before you tool.

Book a free strategy call with Avadium Design leadership. We'll review your idea, map the fastest path to market, and give you a clear scope and budget.

Book a Free CallSee Our Work

Sources

  1. O'Reilly / Wiley — Transdisciplinary Engineering Design: Design for Manufacture
  2. Altium — Design for Manufacturability Starts at Part Selection (David M. Anderson on cost commitment)
  3. Siemens — The 80% rule: Why electronics cost control starts in design